Challenge
Manual coordination slowed result delivery.
AI consulting case studies by Joel & Nanz Inc.
Marketing-optimized case study for Canadian SMBs.
Test scheduling, results notifications, and internal logistics were automated.
Manual coordination slowed result delivery.
Labs use LIS for test tracking and client systems with standard business productivity tools.
Workflow setup
Automation
Go-live
SMBs can choose a Maple SaaS deployment, a hybrid integration with existing tools, or a custom build. The pricing below reflects realistic first-year ranges for each option.
| Approach | First-Year Cost | Annual Savings | ROI | Payback |
|---|---|---|---|---|
| Maple SaaS | CAD 7,500 | CAD 233,000 | 3,006% | 0.3 mo |
| Hybrid | CAD 100,000 | CAD 233,000 | 133% | 5.1 mo |
| Custom Build | CAD 280,000 | CAD 233,000 | -17% | 14.4 mo |
We can estimate ROI and scope the right MapleWorkSuite configuration for your team.
Start a Custom Case Study